Landfill Construction

Construction of a 27 acre municipal solid waste facility for a major waste disposal company. The project encompassed subgrade preparation, underdrain collection system, horizontal methane gas collection system and leachate recovery piping system. The project then entailed the construction of the recompacted soil liner along with the associated processing of material in accordance with permit requirements. The project was completed with the excavation of a future cell and construction of perimeter berm.